References

  1. Atkins, Technical Drainage Memorandum Ward Road, January 2013

  2. Boyle Engineering Corporation, Ralston/Leyden Creeks Hydrology Report, 2003

  3. Boyle Engineering Corporation, Ralston/Leyden Creek Flood Hazard Area Delineation, 2004

  4. City of Arvada, Arvada Comprehensive Plan, October 2014

  5. City of Arvada, Engineering Code of Standards and Specifications, July 2011

  6. Environmental Resources Consultants, Inc. and SM&RC Structural Engineers Inc., Church Ditch Water Authority 82nd Avenue & Quaker Street Jefferson County, Colorado Leyden Crossing Construction Drawings

  7. ICON Engineering Inc., Clear Creek Watershed Flood Study Mapping Barbara Gulch and Leyden Creek Hydraulics Report, 2013

  8. Jefferson County, Design & Technical Criteria Storm Drainage, Revised November 2003

  9. United States Department of Agriculture, Soil Conservation Service, Soil Survey of Golden Area, Colorado

  10. Urban Drainage and Flood Control District, Colorado Urban Hydrograph Procedure 2005 version 1.4.3, January 2014

  11. URS Greiner Woodward Clyde, Flood Control Improvements for Leyden Lake Dam, 2000

  12. United States Army Corps of Engineers, HEC-RAS River Analysis System User’s Manual Version 4.1, Revised January 2010

  13. United States Environmental Protection Agency, EPA SWMM version 5.0 Storm Water Management Model User’s Manual Version 5.0, Revised July 2010

  14. Urban Drainage & Flood Control District et al, Urban Storm Drainage Criteria Manual, 2008

  15. Vision Land Consultants, Inc., Request for Letter of Map Revision Mapleleaf subdivision Filing No. 2, 2006

  16. Water & Earth Technologies, September 11-13, 2013 Arvada Flood Event Reconstruction and Documentation, 2014

  17. Wright McLaughlin Engineers, Ralston/Leyden Creek Major Drainageway Planning, 1977

  18. Wright Water Engineers, Lower Ralston/Van Bibber and Leyden Creeks Phase B Report, February 1986