Town of Milliken
Stormwater Master Plan
Reaches:
- Northern Tributary
- Western Tributary
- Lola Park Tributary
- Eastern Tributary
- Big Thompson Tributary
Existing Structures:
- Storm Sewer
Culverts
Maximum Flow Depth

Identified Problem Area
Improvements:
- Culvert
- Open Channel
- Pipe
- Drop Structure
- Other
Detention Pond